Buying a product?
You are building your own device — NexVDO SDK plus YUAN hardware inside your product.
Start at the SDK →Request an evaluation
A light registration, then a substantive answer — from an engineer — within 48 hours. Evaluation hardware ships from U.S. stock.
Included free with YUAN hardware, delivered through a supported evaluation path — engineer answer within 48 hours.

Neteon operates this portal, U.S. evaluation logistics and inventory, and first-line support. YUAN High-Tech builds the SDK and the hardware.
Direct contact details — pending publicationSix fields. Only this page collects information.
You are building your own device — NexVDO SDK plus YUAN hardware inside your product.
Start at the SDK →You need an integrated stack delivered and supported — hardware, software, and integration through Neteon.
Request scoping →An engineer reads your use case and replies with specifics: whether the SDK covers your pipeline, which hardware fits, and what the evaluation includes. It is not an autoresponder.
Engineers. Neteon operates the first line from the U.S. Escalations go to YUAN engineering in Taipei.
Evaluation hardware from U.S. stock. The exact platform is agreed in the engineer's reply — a SmartVDO Edge system, a capture card with an x86 host, or the Pandora dev kit.
The SDK build for your target platform plus sample code, delivered through a supported evaluation path. The published Starter Kit contents list is pending.
Starter Kit contents — pending publication
The form above is the whole process. An engineer reads it and answers within 48 hours.
Request evaluationOnly this page collects information — no newsletters, no popups anywhere on the site.